Near-term vegetative clearing and stabilization for the North and South Easton Pond Dam sediment basin, protecting dam integrity while the long-term Easton Pond Dam Resilience Project advances through design and permitting.
Long-term flood resilience improvements for the South Easton Pond Dam, including embankment raising, articulated concrete block armoring, spillway reconstruction, and a crest gate to protect Aquidneck Island’s only public drinking water source from coastal storms and sea level rise.